Search Members Help

» Welcome Guest
[ Log In :: Register ]

1 members are viewing this topic
>Guest

Page 5 of 15<<123456789>>

[ Track This Topic :: Email This Topic :: Print this topic ]

reply to topic new topic new poll
Topic: Al "Minnow" Brooks is Worthless in Albert Lea, Albert Lea City Councilman< Next Oldest | Next Newest >
 Post Number: 41
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Mar. 30 2015,7:11 pm  Skip to the next post in this topic. Ignore posts   QUOTE

(KAAL) Road Construction Looms Large For Albert Lea 3/13/2015


View on YouTube
Offline
Top of Page Profile Contact Info 
 Post Number: 42
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Apr. 02 2015,8:39 pm Skip to the previous post in this topic. Skip to the next post in this topic. Ignore posts   QUOTE

Shouldn't all Advertisement for Bids Contracts include the address of where all the work is to be done?

Like this..

http://www.cityofalbertlea.org/wp-cont...551.pdf

Not Like this..

http://www.cityofalbertlea.org/wp-cont...550.pdf

2015 Neighborhood Construction Projects(Looks Legal)

College St – Adams Ave to Washington Ave
Court St – Adams Ave to Washington Ave
Mill St – Euclid Ave to Washington Ave
Jefferson Ave – Front St to Madison Ave
Washington Ave – Front St to the UPRR
Oline Dr – SE Broadway Ave to the west end
Sykes Street – YH Hanson Ave to the east end
Bel Air Dr – TH 69 to the south end
http://www.cityofalbertlea.org/departm...rojects

Public Notice for the same(Doesn't look legal)

Jefferson Avenue – Front Street to Madison Avenue College Street – Adams Ave to Washington Ave
Court Street – Adams Avenue to Washington Avenue Mill Street – Euclid Avenue to Washington Avenue
Washington Avenue – Front Street to UPRR Oline Drive – west end to S. Broadway Avenue
Sykes Street – YH Hanson Avenue to the east end Bel Aire Drive – TH 69 to the south end
http://www.cityofalbertlea.org/public-notices/
Offline
Top of Page Profile Contact Info 
 Post Number: 43
nzeroesc Search for posts by this member.

Avatar



Group: Super Administrators
Posts: 258
Joined: Aug. 2005
PostIcon Posted on: Apr. 03 2015,2:03 pm Skip to the previous post in this topic. Skip to the next post in this topic. Ignore posts   QUOTE


(alcitizens @ Apr. 02 2015,8:39 pm)
QUOTE
2015 Neighborhood Construction Projects(Looks Legal)

College St – Adams Ave to Washington Ave
Court St – Adams Ave to Washington Ave
Mill St – Euclid Ave to Washington Ave
Jefferson Ave – Front St to Madison Ave
Washington Ave – Front St to the UPRR
Oline Dr – SE Broadway Ave to the west end
Sykes Street – YH Hanson Ave to the east end
Bel Air Dr – TH 69 to the south end
http://www.cityofalbertlea.org/departm...rojects

Public Notice for the same(Doesn't look legal)

Jefferson Avenue – Front Street to Madison Avenue
College Street – Adams Ave to Washington Ave
Court Street – Adams Avenue to Washington Avenue
Mill Street – Euclid Avenue to Washington Avenue
Washington Avenue – Front Street to UPRR
Oline Drive – west end to S. Broadway Avenue
Sykes Street – YH Hanson Avenue to the east end
Bel Aire Drive – TH 69 to the south end
http://www.cityofalbertlea.org/public-notices/

So they missed the enter key a couple times.  The list is exactly the same in the bid as the public notice.

As for the contract number 1, I would assume it doesn't include specific streets as the list would be 20 pages long.  The first contract of the year is typically the one for repairing all potholes, curb cuts and surface penetrations for water main breaks, repairs, and general overlay, not for specific street improvement projects.  It is the overall bid for the year for materials.
Offline
Top of Page Profile Contact Info 
 Post Number: 44
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Apr. 03 2015,6:37 pm Skip to the previous post in this topic. Skip to the next post in this topic. Ignore posts   QUOTE


(nzeroesc @ Apr. 03 2015,2:03 pm)
QUOTE
As for the contract number 1, I would assume it doesn't include specific streets as the list would be 20 pages long.  The first contract of the year is typically the one for repairing all potholes, curb cuts and surface penetrations for water main breaks, repairs, and general overlay, not for specific street improvement projects.  It is the overall bid for the year for materials.

This is far from 20 pages long..

QUOTE
2015 NEIGHBORHOOD IMPROVEMENT PROJECT – 2015 BITUMINOUS CONTRACT NO. 1 (1550)

College St – Adams Ave to Washington Ave
Court St – Adams Ave to Washington Ave
Mill St – Euclid Ave to Washington Ave
Jefferson Ave – Front St to Madison Ave
Washington Ave – Front St to the UPRR
Oline Dr – SE Broadway Ave to the west end
Sykes Street – YH Hanson Ave to the east end
Bel Air Dr – TH 69 to the south end
City Wastewater Treatmeant Plant
Offline
Top of Page Profile Contact Info 
 Post Number: 45
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Apr. 03 2015,11:31 pm Skip to the previous post in this topic. Skip to the next post in this topic. Ignore posts   QUOTE

City of Albert Lea
Offline
Top of Page Profile Contact Info 
 Post Number: 46
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Apr. 05 2015,1:43 pm Skip to the previous post in this topic. Skip to the next post in this topic. Ignore posts   QUOTE

Al "Minnow" Brooks needs to give a big thanks to the Freeborn County Assessor's Office for him getting reelected last year.. You would almost think that our local government tried to keep Brooks in his position.. ???

The assessed market values of homes in Ward 6 have dropped more than any other area in Albert Lea including the street he lives on which resulted in a lower property tax bill..

The assessed market value of Al Brooks home at 1402 Academy has dropped 23% since 2012 resulting in a $534 tax bill rather than the $730 he had in 2012.. Both figures include a Special assessment for having a street mill & overlay(asphalt)..

He currently pays less with a Special assessment than he would have in 2012 without a Special assessment..

Check your Property's Assessed Market Value at:

Online Property Search
http://www.co.freeborn.mn.us/126/Assessor

Ryan Rasmusson
County Assessor
rasmusson@co.freeborn.mn.us


Attached Image
Attached Image
Offline
Top of Page Profile Contact Info 
 Post Number: 47
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Apr. 06 2015,10:10 pm Skip to the previous post in this topic. Skip to the next post in this topic. Ignore posts   QUOTE

This is the change of the Assessed Market Value for the personal residence of the Mayor and Albert Lea City Councilmen since 2012..

Vern Rasmussen Jr.  +3%

John H. Shulte V      -4%

Larry Baker            +9%

George Marin          -11%

Reid Olson              -11%

Larry Anderson        -3%

Al "Minnow" Brooks  -23%
Offline
Top of Page Profile Contact Info 
 Post Number: 48
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Apr. 07 2015,4:35 am Skip to the previous post in this topic. Skip to the next post in this topic. Ignore posts   QUOTE

Freeborn County Commissioners AMV since 2012..

Christopher Shoff     -8%

Michael Lee             -5%

Belshan Farms        +35% AGRICULTURAL

Glen Mathiason       +16% AGRICULTURAL

James Nelson         +16% AGRICULTURAL
Offline
Top of Page Profile Contact Info 
 Post Number: 49
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Apr. 14 2015,1:51 am Skip to the previous post in this topic. Skip to the next post in this topic. Ignore posts   QUOTE

To save money the City should eliminate the sidewalk on the east side of Virginia Place from 5th St to 7th St and then widen the street..

That sidewalk doesn't go all the way to 7th St anyway..


Attached Image
Attached Image
Offline
Top of Page Profile Contact Info 
 Post Number: 50
alcitizens Search for posts by this member.
Albert Lea
Avatar



Group: Members
Posts: 3664
Joined: Jul. 2009
PostIcon Posted on: Apr. 15 2015,4:32 am Skip to the previous post in this topic.  Ignore posts   QUOTE

If flooding has been an issue on South Virginia Place, why would an Albert Lea City Councilman and an Albert Lea City Manager refuse to correct what has been common knowledge for decades? Do they think that as long as they pour some concrete every few years that they are immune from liability if flooding were to happen to those residents that results in major damages?

This is no longer a CHRISTOPHERSON case.. This will be flat out negligence by the City of Albert Lea..

neg·li·gence
ˈneɡləjəns/
noun
failure to take proper care in doing something.
Offline
Top of Page Profile Contact Info 
146 replies since Mar. 25 2015,5:46 am < Next Oldest | Next Newest >

[ Track This Topic :: Email This Topic :: Print this topic ]


Page 5 of 15<<123456789>>
reply to topic new topic new poll

» Quick Reply Al "Minnow" Brooks is Worthless in Albert Lea
iB Code Buttons
You are posting as:

Do you wish to enable your signature for this post?
Do you wish to enable emoticons for this post?
Track this topic
View All Emoticons
View iB Code
Emoticon Emoticon Emoticon Emoticon Emoticon Emoticon Emoticon Emoticon Emoticon Emoticon Emoticon